Language Switcher

v2025 (2)

v2025

Controlled Water Releases Begin at Victoria, Randenigala and Rantembe Reservoirs

The Mahaweli Authority has commenced regulated water discharge operations at three key reservoirs after persistent heavy rainfall raised water levels in their catchment areas.According to the Authority, the sluice gates were opened at 10.20 a.m. today  as part of routine flood control measures. At the Victoria Reservoir, six sluice gates were lifted by 70 centimetres each to release excess water.

At the Randenigala Reservoir, two gates were opened, with one raised by 2.5 metres and the other by 1 metre. Meanwhile, at the Rantembe Reservoir, two sluice gates were adjusted to 2 metres and 2.5 metres, respectively.

The Mahaweli Authority stated that the controlled releases were necessary to manage rising reservoir levels caused by recent rainfall. Members of the public, particularly those residing in downstream and low-lying areas, have been advised to remain alert and take necessary safety precautions.

Leave your comments

Post comment as a guest

0
Your comments are subjected to administrator's moderation.
terms and condition.
  • No comments found